top of page
Primary Engineer Award Winning Design

Flat Pack Wind Turbine

Search

Purchasing has Begun!!

Writer's picture: Ryan McDermottRyan McDermott

With the project well underway, we have finally be able to start ordering some of the materials and key items required for the prototype. All of the necessary electrical components have been purchased, from the generator to the battery. All of which are currently awaiting testing. All of the other components that make up the mast, base and blades we are still awaiting arrival. The rest of the components required, such as the couplers for connecting the mask are currently being manufactured by 3D printers.





17 views0 comments

Recent Posts

See All

Comments


bottom of page